The i7 came in today! And I'm pretty sure I have a final parts list.
The i7 was really anti climactic. I won't post pictures, we all know what a processor looks like. Only exciting thing is it came a day earlier than expected.
I ended up getting some pretty sweet deals on tubing, some fittings, and a reservoir, so I changed from a bay reservoir to a Swiftech Micro Res. I also got 20 feet of 1/2" inner diameter clear Primochill tubing, and some random fittings (2 fillports, and 2 t lines). acquiring this dropped my total costs on my pay check in January to just my water blocks. Pretty sweet.
So, for my final parts list, it looks like I have the following....
I haven't decided if I'll be keeping the Bitspower barbs or moving to compression fittings. I might do a combination of the two, compressions for the visible stuff. Well, it's off to bed for Jon now, will update again soon!
-Jon
The i7 was really anti climactic. I won't post pictures, we all know what a processor looks like. Only exciting thing is it came a day earlier than expected.
I ended up getting some pretty sweet deals on tubing, some fittings, and a reservoir, so I changed from a bay reservoir to a Swiftech Micro Res. I also got 20 feet of 1/2" inner diameter clear Primochill tubing, and some random fittings (2 fillports, and 2 t lines). acquiring this dropped my total costs on my pay check in January to just my water blocks. Pretty sweet.
So, for my final parts list, it looks like I have the following....
TFC Xchanger 360 w/ 6x Noctua NF-P12 in push/pull configuration
Swiftech MCP355 w/ EK X-Top Revision 2
Swiftech Micro Res revision 2
EK Supreme HF acetal nickel revision 2
EK GTX 470 acetal nickel block
Primochill 1/2" clear tubing
Various fittings
I haven't decided if I'll be keeping the Bitspower barbs or moving to compression fittings. I might do a combination of the two, compressions for the visible stuff. Well, it's off to bed for Jon now, will update again soon!
-Jon